Project Overview

Carroll Daniel Engineering, formerly O’Neal, Inc., was engaged by Duracell to complete a detailed programming and conceptual study to set the direction for a complex, multi-phased expansion. Carroll Daniel Engineering worked closely with Duracell and the selected contractor early to establish an accurate cost for the projected work. Carroll Daniel Engineering completed the final design for the project.

Duracell

Scope of Work

The work included 70,000 SF addition for shipping and warehousing, 8,000 SF addition to existing Spun Zinc facility for immediate installation of third system (and plans for fourth system), addition of new larger plant kitchen/dining facility and numerous projects associated with central plant/utilities, parking, entrances and onsite recycling.

Related Case Studies

Iron Oxide Pigments Production Plant
Carroll Daniel Engineering provided engineering, procurement and construction (EPC) services for the 80-acre site and production facility.
Michelin TWEEL Manufacturing Facility
Michelin partnered with Carroll Daniel Engineering to provide overall delivery on a TWEEL Manufacturing Facility in South Carolina.
Modular Carpet + Tile Manufacturing Facility
Interface selected Carroll Daniel Engineering to provide design and construction services for a two-phase expansion to the center of their operations in LaGrange, Georgia.
Pactiv Evergreen Advanced Packaging Facility
Following a fire that destroyed most of their 237,000 SF Advanced Packaging Solutions plant, Pactiv Evergreen turned to Carroll Daniel Engineering for a design-build solution to demolish the existing building and design and build a new structure as fast as possible.
Teijin Carbon Fiber Manufacturing Facility
Carroll Daniel Engineering has partnered with Teijin (a Japanese chemical, pharmaceutical and information technology company) on a new carbon fiber facility in South Carolina that is part of a $600 million planned investment to supply automotive operations in the United States.
Specialty Paper Mill Hardwood Fiberline
Glatfelter partnered with Carroll Daniel Engineering on the installation of a new hardwood fiberline and oxygen delignification system at their Spring Grove, Pennsylvania facility.