A Rapid Renovation

Huddleston was the second elementary school built in Peachtree City, Georgia. Badly in need of renovation, Fayette County Schools contracted Carroll Daniel to perform a major renovation on an extremely tight schedule.

80,000 SF
4 Month Schedule
590 Students Served
JandDImages 020817-2004

Project Scope

The scope of work included the removal and replacement of all flooring, ceilings, ductwork, light fixtures, data and fire alarms, windows, HVAC units, flat roofing, rooftop gas lines, the transformer, generator, switchgear and many new panels. It also included constructing new interior CMU walls, removing and replacing accent band of CMU along the perimeter of the building, installing a fire line onto the site with two hydrants, installing a sprinkler system in part of the building, and repainting everything – all over a single summer. The project was completed on time and on budget.

Huddleston ES Award

Exceeding Expectations

As a result of the above and beyond efforts of the Carroll Daniel project team to complete this extensive project on time and on budget, the Huddleston Elementary School Renovation Project received a First Place Alliant Build America Award.

 

Perhaps the most impactful statement came from my principal when she summed it up by saying, ‘They did what they said they would do and they kept their promises.’ I can recommend the company without reservation, and in my experience with school-based construction projects, they are something special in the industry.
Joseph Barrow
Former Superintendent, Fayette County Schools

Related Case Studies

Pine Street Elementary School
A new colorful elementary school with an impressive “wing design.”
Loganville Elementary School
Loganville Elementary School is a new elementary school on a 98-acre site. The project included artificial turf play fields and an amphitheater.
exterior image of dining hall at rabun gap
Rabun Gap-Nachoochee School Dining Hall
A beautifully crafted new dining hall for a private college preparatory school located in the Appalachian Mountains.
Discovery High School
The award-winning Discovery High School project consisted of taking an old Bridgestone tire warehouse and significantly altering it into a new high school for Gwinnett County Schools.
Hilsman Middle School
A new two-story, 180,531 SF middle school constructed within a 14 month schedule.
exterior overhead image of gainesville high school advanced studies center showing the lake
Gainesville High School Expansion and Renovations
Carroll Daniel has partnered with Gainesville High School on a multi-phase expansion and renovation of the school’s campus.