Noble_Village_CDC_0031

Achieving Schedule Without Losing Quality

This three-story, 117,072 SF senior living facility building includes 38 independent, 44 assisted living and 18 memory units. The overall design of the structure consisted of engineered cold formed steel, structural steel, hollow core planks, light gauge metal trusses, and several concrete/modular retaining walls that helped with the terrain of the site. Aggressive scheduling management allowed Carroll Daniel to successfully complete the project within 12 months of final permitting, two months faster than originally negotiated, at the request of the owner.

Noble Village path

An Award-Winning Facility

Carroll Daniel’s project team on the Noble Village Assisted Living Facility project received a first place Build Georgia Award for demonstrating construction excellence and commitment to the client. With weekly site meetings and regularly scheduled OAC meetings (Owner, Architect, and Contractor), the Carroll Daniel project team remained dedicated to the client throughout the entire construction process. Fostering good communication between field personnel ensured the schedule was not only met but exceeded and that the building was built soundly with a high-quality standard.

If extra resources were required, Carroll Daniel Construction Company was quick to respond. Due to these efforts, each challenge was successfully met. We are very impressed with Carroll Daniel Construction Company.
Tim Gary
Owner/Managing Member, Noble Village

Related Case Studies

Laurel Lodge Assisted Living & Memory Care
A new 56,593 SF assisted living and memory care facility in the foothills of the Appalachian Mountains.
internal image of the foyer in the phoenix at lake lanier
The Phoenix at Lake Lanier
A premier assisted living and memory care facility that offers specialized services for seniors who experience Alzheimer’s and many forms of dementia.
exterior overhead image of the just people village housing
Just People Village III
Carroll Daniel Construction was selected to build a safe, secure residential development for Just People, Inc., a private non-profit that provides support services to adults with developmental disabilities.
Ridgeview Institute Behavioral Hospital
This abandoned 1950s-era Walton Regional Medical Center was reconstructed into an 86,783 SF, 3-story behavioral hospital.
The Longstreet Clinic Projects
Continuing a strong relationship with the Longstreet Clinic – serving as a trusted partner for the multi-specialty medical group.
Parkway Professional Buildings
A set of three-story medical office buildings are constructed in the growing North Georgia Healthcare Community for a satisfied repeat client.